Case

Case

Heilongjiang First Hospital Containerized Data Center Project
  • Classification:Case
  • Author: Shengpu Weiner Energy Storage Technology
  • Source:
  • Release time:2026-07-06
Project Overview: The core data center room serves as the main computer room for the hospital's core information business operations. It adopts an outdoor prefabricated structural design, consisting of five customized containers. Two sets of micro-modules (18 server cabinets, 1 smart row-level power distribution cabinet, and 3 row-level air conditioners) are prefabricated in the factory, and the containers are transported to the site for assembly into the central computer room. The overall design features are: high efficiency, energy saving, flexibility, and safety. Business Outcomes: Overcame the limitations of insufficient load-bearing capacity and expansion conditions at the user's site. Provided users with a safe and reliable data center infrastructure, and met the user's need for convenient and rapid relocation.

National Service Hotline

0755-88695591

Authorized channel partner verification

©2025 Shenzhen Shengpu Weineng Storage Technology Co., Ltd.

Online Customer Service
Online
对方正在输入...
Feel free to contact us for any inquiries.